← All guides
LOLER 1998UK

LOLER Inspection: How a Thorough Examination of Lifting Equipment Works

What a LOLER inspection is in practice: the thorough examination a competent person makes under Regulation 9, the equipment it covers, the four times it is required, what the examiner checks on cranes, lifts, forklifts and slings, when load testing is part of it, a before-and-after checklist, and what happens when a defect is found.

Reviewed by Allen Carey, Core InspectionLast reviewed

A LOLER inspection is the thorough examination that Regulation 9 of LOLER 1998 requires: a systematic and detailed examination of lifting equipment by a competent person, who then writes a report containing the 11 items in Schedule 1. It is due before first use, after installation at a new site, at least every 6 or 12 months in service, and after anything that could have damaged the equipment. This guide covers the whole process, from what is in scope to what to do with the report. If you need the regulations themselves first, start with what LOLER is.

Thorough examination, inspection and pre-use check

LOLER and HSE's guidance describe three layers of checking. People say "LOLER inspection" for the top layer, the thorough examination, and that is the one with a statutory report.

Pre-use checkInspectionThorough examination
WhoThe operator or user, trained to spot obvious faultsA competent person, often a trained operator or maintenance fitterA competent person independent of the maintenance
WhenBefore use each working day or at the start of each shiftBetween thorough examinations where the risk calls for it, often weekly, monthly or quarterlyBefore first use, after installation, every 6 or 12 months or to a scheme, and after exceptional circumstances
Legal basisL113 ACOP guidance on Regulation 8Regulation 9(3)(b)Regulation 9(1), 9(2) and 9(3)(a)
RecordDefects reported and recordedA written record (Regulation 10(2))A written report with the Schedule 1 items (Regulation 10(1))

Only the thorough examination meets Regulation 9's examination duty. A year of pre-use checks does not stand in for a missed examination, and routine servicing does not count either. HSE's lift truck guidance says plainly that regular inspections in a preventive maintenance scheme or a scheduled service are not a thorough examination.

Lifting accessories such as chains and slings do not normally need the middle layer. HSE says a proper pre-use check plus a thorough examination at the right interval is enough for them. Inspections are mostly for machinery: cranes, forklift trucks, hoists and automated stacking equipment.

What equipment needs a LOLER inspection

LOLER applies to all lifting equipment used for work, including equipment put into use before the regulations came into force in 1998. Lifting equipment is work equipment for lifting or lowering loads, including the attachments that anchor, fix or support it, such as the runway of an overhead crane. A load includes a person. Accessories are the items that attach a load to the machine.

EquipmentLOLER classDefault interval
Overhead, mobile and tower cranesLifting equipment12 months
Hoists, pull-lifts and construction site hoistsLifting equipment12 months, or 6 if it lifts people
Forklift trucks, telehandlers, high-lift pallet trucks raising forks above 300 mmLifting equipment12 months, or 6 with a work platform lifting people
MEWPs and scissor liftsEquipment for lifting persons6 months
Passenger lifts at workEquipment for lifting persons6 months
Goods-only lifts and dumb waitersLifting equipment12 months
Vehicle tail liftsLifting equipment12 months, or 6 if the operator rides the platform
Lorry loader cranesLifting equipment12 months
Excavators fitted for lifting (forks, grabs, magnets, lifting points)Lifting equipment12 months, only when used for lifting
Chain, wire rope and textile slings, shackles, removable eyebolts, lifting beams, spreaders, vacuum lifters, magnets, crane forksLifting accessories6 months
Ropes for climbing or work positioningLifting accessories6 months

The 6-month figure for people follows HSE's position that wherever people are lifted, whether or not the equipment was designed to lift them, it is examined every six months or under an examination scheme. An examination scheme drawn up by a competent person can replace any of these intervals.

L113 lists equipment that is outside LOLER, though it still needs maintaining and may need inspecting under PUWER. The list includes conveyor belts, winching where the load never leaves the ground, roller shutter doors, tipper trucks, the three-point linkage on a tractor, eyebolts permanently fixed in a load, and fall arrest equipment with its structural anchor eyebolts. A passenger lift in a block of flats or a shopping centre, provided for the public, isn't covered by LOLER either, though the Health and Safety at Work Act still applies to it. If it is work equipment that does not lift, keep it on a PUWER inspection register.

The four times a thorough examination is required

Regulation 9 sets four triggers.

  1. Before first use. The exception is equipment that has never been used and came with an EC declaration of conformity made no more than 12 months before it goes into service. HSE treats the manufacturer's declaration as the first examination. Used equipment that arrives with a current report finding it safe doesn't need another one either.
  2. After installation, and after assembly at each new site. This applies where safety depends on the installation conditions. HSE's examples are tower cranes, construction site hoists, gantry cranes and a platform lift installed in a building. Mobile equipment that drives from job to job does not count as installed. If a tower crane is climbed to a new height on the same site, a person with the right knowledge and training decides whether it needs examining again.
  3. In service, at least every 6 or 12 months, or to an examination scheme. This applies to equipment exposed to conditions that cause deterioration liable to result in danger, which in practice is nearly all of it. Wet, abrasive or corrosive environments speed that up.
  4. After exceptional circumstances liable to put safety at risk. The L113 Approved Code of Practice lists an accident or dangerous occurrence such as an overload or component failure, a significant change in use (more use, a change from inert loads to chemicals, moving from indoors to outdoors), and long periods out of use. Substantial modification or repair is a trigger too. L113 adds that very high winds can overload a crane and a failed safe load indicator can let an overload go unnoticed.

Our LOLER inspection frequency guide goes deeper on the 6 and 12-month clocks and examination schemes.

Who can carry out a LOLER inspection

The examiner has to be a competent person, meaning someone with enough practical and theoretical knowledge and experience of the equipment in front of them to detect defects and judge how much they matter. The law sets no single qualification. The examiner can be on your own staff, provided they have the authority and independence to make the call without fear or favour, and they should not normally be the person who maintains the equipment. In the lifting industry the LEEA Diploma is the most widely recognised qualification for examiners, and HSE's lift guidance points to UKAS accreditation to ISO/IEC 17020 as a sign of an inspection body's competence. The LOLER competent person guide covers the detail.

What the examiner checks

HSE leaves the scope to the competent person's judgement, but it has to include everything that affects the safety of the equipment, including how it is likely to deteriorate over time. For most common equipment there are industry standard procedures and criteria the examiner works to. The methods HSE lists are:

  • visual examination and functional checks
  • measurements of wear
  • in some cases, non-destructive testing (NDT) and load testing
  • some disassembly or internal examination, which can mean stripping the equipment down or removing covers

Where an examination scheme exists, the examiner covers the parts it names. Otherwise they cover every part that could lead to danger through deterioration. On common equipment, the attention goes to these parts.

EquipmentWhat the examination concentrates on
Passenger and goods liftsLanding and car doors and their interlocks, worm and other gearing, the main drive system, governors, safety gear, suspension ropes and chains, overload detection, electrical safety devices and earthing, brakes including buffers and overspeed devices, and hydraulics (HSE INDG339)
Forklift trucks and telehandlersThe lifting mechanism, such as the chains and forks, under LOLER. Brakes, steering, lights, tyres and fall-over protection are inspected under PUWER, and the two can be combined (HSE INDG422)
CranesStructure and jib, limiters and rated capacity indicators, controls, missing components such as bolts, and tyres on mobile cranes. The BS 7121 series sets crane inspection and overload test practice
Excavators used for liftingThe lifting point and its safety catch, the quick hitch and its locking pin, boom lowering check valves, the overload warning device and the rated capacity table in the cab. Our excavator thorough examination guide has the detail
Vehicle tail liftsExamined to the industry guidance from the Society of Operations Engineers (SOE), which HSE points to. Our tail lift LOLER inspection sheet lays out the sections
Chain slingsDeformed or stretched links and cracks
Wire rope slingsBroken wires and kinks
Textile slingsDamage, cuts, abrasion and stretching
All equipmentIdentification and SWL marking. Equipment and accessories must be visibly marked with their safe working load, and equipment for lifting people marked as such

Across all of these, L113 names the defects that come up most often as hazards: cracks and permanent deformation, corrosion of safety-critical parts, excessive wear or failure of moving parts such as interlocks, and significant misalignment.

LOLER testing: when a load test is part of it

"LOLER testing" usually means one of two things: the thorough examination as a whole, or a load test carried out during it. On load tests, a thorough examination includes whatever testing the competent person considers appropriate, and the competent person decides whether a load test is needed at all and what kind.

HSE says most lifting equipment does not need routine testing as part of the thorough examination, and that some overload tests can damage the equipment they are meant to check. Where a test is needed, it may not be needed at every examination. The decision rests on risk, taking account of the manufacturer's instructions on how often testing should happen. Other tests, such as NDT, can be added where the examiner needs them to judge the equipment properly.

If an overload test is done, L113 expects it to be the competent person's call and carried out with precautions: the area cleared, only essential workers present, the test finished as quickly as possible, and mobile equipment positioned away from buildings. Whatever is done, item 8(e) of Schedule 1 requires the report to give particulars of any test.

LOLER inspection checklist

Before the examination

  • List every item due, with its ID, location, SWL and due date. A lifting equipment register makes this a filter instead of a hunt.
  • Pull out the last report for each item, any declarations of conformity for new equipment, and the examination scheme if you work to one.
  • Tell the examiner about anything that has changed since the last visit: incidents, overloads, repairs, a new environment, heavier use or long idle periods. HSE expects you to pass this on, and it can change both the examination and the scheme.
  • Have the manufacturer's instructions available. The examiner uses them to decide on testing and its frequency.
  • Plan downtime. Some examinations need covers off or a strip-down, and equipment in service on a production line or construction site has to be released for it.
  • Gather accessories from vans, stores and sites in one place, and keep them separate from items already quarantined for repair.

On the day

  • The examiner works through visual and functional checks, wear measurements, and any NDT or load test they decide is needed.
  • Any defect that is or could become a danger is reported to you forthwith. HSE expects a serious one to be reported verbally on the spot.
  • Equipment with a dangerous defect comes out of use there and then.

After the examination

  • The written report should reach you within 28 days, the period L113 expects in normal circumstances.
  • Check it against Schedule 1 and note the next examination date for each item.
  • Put a date and an owner against every defect with a time limit.
  • File the report and update the register. Send a copy with any item that goes out on hire or to another business.

A blank LOLER report template in PDF and Word shows every field the report needs.

The report of thorough examination

After the examination, the competent person makes a written report, authenticated by signature or an equally secure means, containing the 11 items in Schedule 1. It goes to the employer the examination was made for and to anyone the equipment was hired or leased from. HSE no longer prescribes a form, and an electronic report is acceptable as long as a written copy can be produced when needed. The report is what most people call a LOLER certificate, and our LOLER certificate guide goes through all 11 items with a worked example.

Defects and Regulation 10(3)

Regulation 10(3) treats two kinds of defect differently. Equipment with a defect that is a danger now must not be used until the defect is put right. For a defect that is not yet a danger but could become one, Schedule 1 item 8(c) states the time by which it could become dangerous, and the equipment must not be used after that time until the repair is done.

Where the examiner finds an existing or imminent risk of serious personal injury, they also send a copy of the report to the enforcing authority: HSE if the equipment is hired or leased, otherwise the authority for the premises where it was examined. L113 gives a structurally damaged crane jib as the example. Defects go in the report even when the item is scrapped on the spot or repaired immediately. L113 says failing to report a defect because it has already been fixed disguises a potentially dangerous situation.

How often LOLER inspections are due

EquipmentThorough examination
Lifting accessoriesAt least every 6 months
Equipment for lifting peopleAt least every 6 months
All other lifting equipmentAt least every 12 months
Any of the above under an examination schemeAt the intervals the scheme sets
Any lifting equipment after exceptional circumstancesEach time they occur

An examination scheme can set longer or shorter intervals, but L113 says a longer one has to rest on a rigorous assessment of the risks. If you cannot produce a written scheme when an inspector asks for one, HSE assumes you are working to the 6 and 12-month periods, and expects a current report for each item. The LOLER inspection frequency guide covers schemes in full.

Hired and transferred equipment

Regulation 9(4) stops lifting equipment leaving a business, or being used in a business it came from someone else, unless it is accompanied by physical evidence that its last thorough examination was carried out. That is normally a paper or electronic copy of the last report. L113 lists what the evidence should show: who the examination was made for, where, enough to identify the equipment, the date of the last examination, whether defects found then have been fixed or remain outstanding, when the next examination is due, and the SWL for each configuration. A contractor carrying slings in a van to a client's site should have that evidence with them. Moving equipment between your own sites doesn't need it, as long as the records are held centrally and available on request.

Keeping the records

Regulation 11 sets how long each report is kept. A periodic report is kept until the next one is made, or for two years, whichever is later. A report from the examination before first use is kept until you stop using the equipment, or for two years for a lifting accessory. An installation report is kept until the equipment stops being used at that place, and an inspection record until the next one is made. Keep declarations of conformity for as long as you operate the equipment. Records can be held electronically, protected from unauthorised changes, provided you can produce a written copy for an inspector or when equipment leaves your business.

Running LOLER inspections for clients

For a lifting equipment service company, every client has its own register, every item its own 6 or 12-month clock or scheme interval, and every examination has to end in a Schedule 1 report the client can find when HSE asks. Most of what goes wrong is clerical, such as an accessory missed because it was in a van, an 8(c) deadline nobody chased, or an ID typed differently on two reports. Core runs the examination from the asset record on the technician's phone, builds the report from it, flags failed items out of service, and tracks defect deadlines and next-due dates per client, with each client seeing their own register in a portal at no per-login cost. Core's LOLER inspection software page covers the UK workflow, and the lifting equipment inspection software page covers registers across standards.

Sources

Put this guide to work

Free ROTE template with every Schedule 1 field, in PDF and Word. Or see the whole program running (scheduling, mobile inspections, certificates) in an interactive demo. No signup, about 3 minutes.

Frequently asked questions

What is a LOLER inspection?

It is the everyday name for the thorough examination that Regulation 9 of LOLER 1998 requires: a systematic and detailed examination of lifting equipment by a competent person, looking for defects that are or could become dangerous, followed by a written report containing the 11 items in Schedule 1. LOLER also uses the word inspection for a lighter check between thorough examinations, under Regulation 9(3)(b), which produces a written record instead of a full report.

How often should lifting equipment be inspected?

There are three layers. The operator makes a pre-use check each working day or at the start of each shift. Where the risk calls for it, a competent person inspects the equipment between examinations, often weekly, monthly or quarterly for machinery such as cranes. A competent person makes a thorough examination at least every 6 months for lifting accessories and equipment that lifts people, at least every 12 months for other lifting equipment, or at the intervals set by an examination scheme.

What is LOLER testing?

People use it to mean either the thorough examination itself or a load test carried out as part of it. LOLER lets a thorough examination include whatever testing the competent person thinks appropriate, and the competent person decides whether a load test is needed and what kind. HSE says most lifting equipment does not need routine testing as part of the thorough examination, and some overload tests can damage equipment. Where a test is done, Schedule 1 requires the report to give its particulars.

Does a forklift need a LOLER inspection?

Yes. Lift trucks and telescopic handlers are lifting equipment, so the lifting mechanism, such as the chains and forks, needs a LOLER thorough examination at least every 12 months, or every 6 months if the truck is used with a work platform to lift people. The rest of the truck, such as brakes, steering, lights and tyres, is inspected under PUWER. The two can be done together by someone competent for both. Routine servicing does not count as a thorough examination.

What equipment needs a LOLER inspection?

All lifting equipment provided for use at work, whatever its age. HSE lists cranes, lift trucks and telehandlers, high-lift pallet trucks that raise the forks above 300 mm, passenger and goods lifts at work, construction hoists, pull-lifts, vehicle inspection hoists, MEWPs and scissor lifts, lorry loader cranes, vehicle tail lifts and excavators fitted for lifting. Lifting accessories are covered too: slings, chains, ropes, shackles, removable eyebolts, grabs, magnets, vacuum lifters, crane forks, lifting beams and spreaders.

Who can carry out a LOLER inspection?

A competent person with enough practical and theoretical knowledge and experience of that kind of equipment to find defects and judge how serious they are. They can be an employee or work for another company, as long as they are independent and impartial enough to make objective decisions. They should not normally be the person who maintains the equipment, because they would then be examining their own work.

What happens if lifting equipment fails a LOLER inspection?

The examiner must tell the employer forthwith about any defect that is or could become a danger to people. Equipment with a dangerous defect must not be used until the defect is put right. For a defect that could become dangerous, the report gives a time limit, and the equipment must not be used after it until the repair is done. Where there is an existing or imminent risk of serious personal injury, the examiner also sends a copy of the report to HSE or the local authority.

Does new lifting equipment need a LOLER inspection before first use?

Not if it has never been used, came with an EC declaration of conformity made no more than 12 months before it is put into service, and does not depend on how it is installed. HSE treats the manufacturer's declaration as standing in for the first examination. Equipment assembled or installed on site, such as a tower crane or a platform lift fitted in a building, needs a thorough examination after installation and before first use.

Is a LOLER inspection the same as a service?

No. Maintenance replaces worn parts, lubricates, tops up fluids and makes adjustments so the equipment keeps working, and PUWER requires it for all work equipment. A thorough examination checks whether the equipment is safe to keep using. HSE says an examination may reveal poor maintenance but is not meant to replace it, and you should not wait for the examination before doing maintenance.

Does hired lifting equipment need its own LOLER inspection?

It needs to arrive with physical evidence that its last thorough examination was carried out, normally a copy of the current report, paper or electronic. Under Regulation 9(4), equipment cannot leave a business, or be used in a business it came from someone else, without that evidence. Used equipment that comes with a current report finding it safe does not need another examination before first use at your premises, unless it has to be installed.

Is fall arrest equipment covered by LOLER?

Fall arrest equipment is not, and nor are eyebolts fixed to a structure to anchor it, which HSE treats as part of the building. PUWER still applies to it. Ropes used for climbing or work positioning, for example in arboriculture or on telecommunication towers, are covered by LOLER as lifting accessories.