Reviewing and Editing AI Summaries
How an authoriser checks an AI summary against the inspection record, edits it on Job Details or Edit Inspection, and what happens to it once the job is Approved.
Last updated
An AI summary is a draft until a person has read it. Core gives authorisers the chance to read and correct every job and inspection summary before the job is approved, and fixes the text once it is.
Reading a summary during authorisation
On Batch Authorisation, the inspection summary appears under each item's header as you work through the queue. When you reach the prompt to mark the job Complete and Approved, the job summary is shown in that prompt, because approving the job is what fixes it.
Read the summary against the record. Core already checks that every number in the summary appears in the record, and the AI is instructed never to change a result. What it cannot know is whether the emphasis is right for this client, or whether a comment it quoted needs explaining. That part is the authoriser's call.
Editing a summary
You need to be an authoriser.
- Open the job on Job Details (for the job summary) or the inspection on Edit Inspection (for an inspection summary).
- Next to the summary, click Edit.
- Change the text in the box. The limit is 4,000 characters.
- Click Save summary.
The label next to the summary changes to "AI-generated, edited by" followed by your name.
Once a summary has been edited, Core never rewrites it. Your wording stays even if the job is changed afterwards, so if you correct an inspection after editing its summary, update the summary yourself.
Equipment history summaries cannot be edited. They are rewritten each time the item is inspected.
After the job is Approved
Approving a job fixes its job summary and its inspection summaries.
- The Edit link no longer saves. If you try, Core refuses the change.
- Core no longer rewrites the summaries, even if the record is changed later.
This matters because certificates and reports may already have gone to the client with the summary printed on them. The text on the page and the text in Core stay the same.
If your account does not use approvals, summaries stay editable after the job is Complete.
If a summary is wrong
Edit it, if the job is not yet approved. If the same kind of mistake keeps coming up (an abbreviation your team uses that is being read wrongly, for example), send the job number to support@coreinspection.com so we can look at why.
The summary never alters the inspection record. A wrong summary can mislead a reader, which is why it is worth reading before approval, but the result, the checklist answers and the certificate fields are untouched by it.
If a summary is missing
A record has no summary when:
- the job was completed before AI summaries were switched on for your account,
- the job was completed in the last few minutes and has not been processed yet,
- the inspection passed with no comment, or only a standard comment (the job summary still covers it in its counts),
- the item's history has nothing in it but routine passes,
- the summary failed Core's number check twice and was discarded.